Unplanned downtime
Predict the stoppage before the shift feels it.
- Signal
- Vibration and load on a tracked asset drift past the healthy band.
- Action
- Raise the work order and take the planned stop inside the maintenance window.
- Verified result
- Line-down hours avoided, and output that holds.